logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Irrigation, Waterways , Hydrology Section 5

  • 1) Question.

    Interception losses are due to

    i) evaporation

    ii) transpiration

    iii) stream flow

    The correct answer is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    A hyetograph is a graphical representation of

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    A hydroelectric scheme operating under a head of 80m will be classified as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    The net head under which the turbine reaches its peak efficiency at synchronous speed is called

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    A runoff river plant

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    The net speed under which the turbine reaches its peak efficiency is called

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    A runoff river plant is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    A land is known as water logged

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    Select the incorrect sentence.

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 11) Question.

    A river bend in alluvial soil is characterised by

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 12) Question.

    Length and width of a meander are proportional to

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 13) Question.

    A river training work is generally required when the river is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 14) Question.

    A repelling groyne is aligned

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 15) Question.

    If D is the depth of scour below original bed then the width of launching apron is generally taken as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 16) Question.

    Main purpose of mean water training for rivers is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 17) Question.

    River training for depth is achieved by

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 18) Question.

    Select a correct statement

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 19) Question.

    Tortuosity of a meandering river is always

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 20) Question.

    The main cause of meandering is?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.