logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Highway Sheet 19

  • 1) Question.

    First operation during the detailed survey of a hill road, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    Deviation of the alignment of a trace cut may be permitted in areas involving

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    The gradients of trace cuts for hilly roads, are kept

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    During last phase of the reconnassance, details of the grade line is recorded on 2 metre poles to indicate

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    The first state of deciding the alignment of a hill road, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    Alignment of highways in hilly regions, is decided on

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    Shoulders for high traffic volume roads, should

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    For a 6.6 m wide two lane pavement, berms are provided on either side having a width of

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    If the rate of change of grade permitted along a vertical curve ir r and total change of grade is g%, the length L of the curve to be provided, is

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    Setting out of Lemniscate transtion curves, is done with

    Answer.

    A lemniscate curve is said to be transitional throughout if its polar deflection angle at the apex is equal to D/6, where D is the total deflection angle of the curve. This means that the curve smoothly transitions from one side to the other, without any sudden changes in direction or curvature.

    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 11) Question.

    Consider the following statements :

    Collision diagram is used to -

    1. study accident pattern.
    2. eliminate accidents.
    3. determine remedial measures.
    4. make statistical analysis of accidents.

    Of these statements -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 12) Question.

    For the relationship u= 55-0.44 k, where u is the speed in kmph and k is the density in vpkm, what will be the maximum flow in vph ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 13) Question.

    Consider the following statements with reference to pavements :

    1. Flexible pavements are more suitable than rigid pavements in regions where subgrade strength is uneven.
    2. Load carrying capacity of rigid pavements depends more on the properties of concrete than the strength of subgrade.
    3. Compared to flexible pavements, rigid pavemnets are more affected by temperature variations.

    Of these statements -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 14) Question.

    Ratio of the width of the car parking area required at kerb for 300 parking relative to 600 parking is approximately -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 15) Question.

    Consider the following situations :

    1. Traffic volume entering from all roads is less than 3000 vehicles per hour.
    2. Pedestrian volume is high.
    3. Total right turning traffic is high.
    4. A road in a hilly region.              

     A rotary will be more suitable than control by signals, in situations listed agaisnt -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 16) Question.

    In desire-line diagram -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 17) Question.

    Which one of the following causes ravelling in bituminous pavemnet ?

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 18) Question.

    A summit curve is formed at the intersection of a 3% up gradient and 5% down gradient. To provide a stopping distance of 128 m, the length of summit curve needed will be -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 19) Question.

    The maximum super elevation to be provided on a road curve is 1 in 15. If the rate of change of super elevation is specidied as 1 in 120 and the road width is 10 m, then the minimum length of the transition curve on either end will be -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 20) Question.

    In highway construction on superelevated curves, the rolling shall proceed from

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.