1) Question.
Volume of traffic which would immediately use a new road or an improved one when opened to traffic, is known
Answer. -
2) Question.
Volume of traffic which is due to improvement carried out in adjacent area, is known as
Answer. -
3) Question.
Increase in traffic vulume, due to increase in transport vehicles, is known as
Answer. -
4) Question.
An intersection of roads, the traffic vulume study is carried out to ascertain the number of vehicles
Answer. -
5) Question.
As per recommendations of I.R.C., traffic volume study is carried out for rural roads for 7 days contimuously during
Answer. -
6) Question.
Traffic census is carried out for
Answer. -
7) Question.
Traffic surveys are carried out
Answer. -
8) Question.
Roughness index of roads, is expressed as
Answer. -
9) Question.
Driving vehicles on wet surfaced roads, is dangerous because it may
Answer. -
10) Question.
Alont horizontal curves, if centrifugal force exceeds lateral friction, vehicles may
Answer. -
11) Question.
the background colour of the informatory sign board is -
Answer. -
12) Question.
On a right angled road intersection with two way traffic, the total number of conflict points is -
Answer. -
13) Question.
When the speed of traffic flow becomes zero, then -
Answer. -
14) Question.
The diagram which shows all important physical conditions of an accident location like roadway limits, bridges, tress and details of roadway conditions is known as -
Answer. -
15) Question.
Scientific planning of transportation system and mass transit facilities in cities should be based on -
Answer. -
16) Question.
If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maximum capacity of a traffic lane at a speed of 10m/sec is -
Answer. -
17) Question.
Equivalent factor of passenger car unit (PCU) for a passenger car as per IRC is -
Answer. -
18) Question.
With increase in speed of the traffic stream, the maximum capacity of the lane -
Answer. -
19) Question.
If the average centre to centre spacing of vehicles is 20 metres, then the basic capacity of a traffic lane at a speed of 50 kmph is -
Answer. -
20) Question.
In highway construction on superelevated curves, the rolling shall proceed from
Answer.