logo
Log In
  • Engineering
    • Civil Engineering
      • Building Materials
      • Concrete Technology And Design Of Concrete Structure
      • Building Materials And Construction
      • Concrete Technology
      • Surveying
      • Reinforced Cement Concrete Structures
      • Highway Engineering
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Soil Mechanics And Foundation Engineering
      • Estimate And Costing
      • Strength Of Materials
      • Construction Planning And Management
      • Steel Design
      • Strucrtural Analysis
      • Fluid Mechanics
      • Railway Engineering
      • Design Of Masonry Structure
      • Building Construction
      • Advance Surveying
      • Airport Engineering
      • Tunnelling
      • Docks And Harbours
      • Structural Design Specification
      • Water Supply Engineering
      • Hydrology
      • Irrigation
  • Previous Year Questions
    • Wbpsc Je
    • Wbpsc Ae
      • Ae Wbpsc 2001
      • Ae Wbpsc 2003
      • Ae Wbpsc 2007
      • Ae Wbpsc 2012
      • Ae Wbpsc 2014
      • Ae Wbpsc 2016
      • 2014
    • Hindustan Petroleum Corporation Limited
      • Hpcl 2021
    • Power Grid Corporation Of India Limited
      • Diploma Trainee (civil), Pgcil
        • Pgcil 2021
        • Pgcil 2018 17/11/18
    • Dfccil
      • Executive Civil
        • 17.04.2016 Dfccil
        • 10.11.2018 Dfccil
    • Coal India Limited
      • Management Trainee
        • 27 Feb 2020. Cil
        • 26.03.2017. Cil
    • Inland Waterways Authority Of India
      • Inland Waterways Authority Of India 2022
    • Maharashtra Psc
    • Odisha Public Service Commission
      • Assistant Executive Engineer
        • Opsc 2015
        • Opsc 2019
    • Haryana Psc
  • Online Test
Listing Banner

Highway Sheet 08

  • 1) Question.

    Volume of traffic which would immediately use a new road or an improved one when opened to traffic, is known

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 2) Question.

    Volume of traffic which is due to improvement carried out in adjacent area, is known as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 3) Question.

    Increase in traffic vulume, due to increase in transport vehicles, is known as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 4) Question.

    An intersection of roads, the traffic vulume study is carried out to ascertain the number of vehicles

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 5) Question.

    As per recommendations of I.R.C., traffic volume study is carried out for rural roads for 7 days contimuously during

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 6) Question.

    Traffic census is carried out for

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 7) Question.

    Traffic surveys are carried out

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 8) Question.

    Roughness index of roads, is expressed as

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 9) Question.

    Driving vehicles on wet surfaced roads, is dangerous because it may

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 10) Question.

    Alont horizontal curves, if centrifugal force exceeds lateral friction, vehicles may

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 11) Question.

    the background colour of the informatory sign board is -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 12) Question.

    On a right angled road intersection with two way traffic, the total number of conflict points is -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 13) Question.

    When the speed of traffic flow becomes zero, then -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 14) Question.

    The diagram which shows all important physical conditions of an accident location like roadway limits, bridges, tress and details of roadway conditions is known as -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 15) Question.

    Scientific planning of transportation system and mass transit facilities in cities should be based on -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 16) Question.

    If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maximum capacity of a traffic lane at a speed of 10m/sec is -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 17) Question.

    Equivalent factor of passenger car unit (PCU) for a passenger car as per IRC is -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 18) Question.

    With increase in speed of the traffic stream, the maximum capacity of the lane -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 19) Question.

    If the average centre to centre spacing of vehicles is 20 metres, then the basic capacity of a traffic lane at a speed of 50 kmph is -

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report
  • 20) Question.

    In highway construction on superelevated curves, the rolling shall proceed from

    Answer.
    • View Answer
    • Discuss in Forum
    • Workspace
    • Report

Question Pallet

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Time Left -
Workspace
:
Report
:
  • Engineering
    • Civil Engineering
      • Building Materials And Construction
      • Highway Engineering
      • Concrete Technology And Design Of Concrete Structure
      • Soil Mechanics And Foundation Engineering
      • Surveying
      • Concrete Technology
      • Irrigation, Water Resources Engineering And Hydrology
      • Environmental Engineering
      • Railway Engineering
      • Construction Planning And Management
      • Strength Of Materials
      • Fluid Mechanics
      • Steel Design
      • Strucrtural Analysis
      • Design Of Masonry Structure
  • About Us
  • Privacy Policy
  • Contact Us
  • Terms & Conditions

© 2018 civilhunt.com. All Rights Reserved.