Estimate and Costing Sheet 9
-
1) Question.
Pick up the incorrect statement from the following:
Answer. -
2) Question.
The concrete work for the following part of the building of specified thickness is measured in square metres
Answer. -
3) Question.
Pick up the excavation where measurements are made in square metres for payment.
Answer. -
4) Question.
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm ,is termed as
Answer. -
5) Question.
The following item of earth work is not measured separately.
Answer. -
6) Question.
Pick up the incorrect statement from the following:
Answer. -
7) Question.
According to ISI method of measurement the sequence is
Answer. -
8) Question.
For 100sq.m cement concrete (1:2:4) 4 cm thick floor,the quantity of cement required,is
Answer. -
9) Question.
For 12 mm thick cement plastering 1:6 on 100sq.m new brick work,the quantity of cement required,is
Answer. -
10) Question.
The cross-sectional area of the embankment of canal fully in embankment Fig. is
Answer.