Estimate and Costing Sheet 8
-
1) Question.
Berms are provided in canals if these are
Answer. -
2) Question.
A cement concrete road is 1000 m long,8m wide and 15 cm thick over the sub-base of 10 cm thick gravel, The cubic content of concrete (1:2:4) for the road specified
Answer. -
3) Question.
A cement concrete road is 1000 m long,8m wide and 15 cm thick over the sub-base of 10 cm thick gravel.The box cutting in road crust is
Answer. -
4) Question.
A portion of an embankment having a uniform upgradient 1 in 500 is circular with radius 1000m of the centre line.If the height of the bank is 1m at the lower end,and side slopes 2:1,the earth work involved
Answer. -
5) Question.
Pick up the correct statement from the following:
Answer. -
6) Question.
The area of the cross-section of a road fully in banking shown in Fig. is
Answer. -
7) Question.
The cross-section of a road partly in banking and partly in cutting is shown in Fig. The area of the shaded portion is
Answer. -
8) Question.
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m m length The height of the embankment at zeroi chainage is 0.5 m,the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earth work calculated by prismoidal formula,is
Answer. -
9) Question.
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in Fig.24.4.If there is a uniform up-gradient of the road 120 in 1,the chainage of the point with no filling or cutting is
Answer. -
10) Question.
The area of a sloping surface of a protective embankment of mean height d,side slopes S:1 and length L is
Answer.