Estimate and Costing Sheet 5
-
1) Question.
As per Indian standard specifications,the peak discharge for domestic purposes per capita per minute,is taken
Answer. -
2) Question.
The surface area of the brick wall of 10 cm thickness of the drain specified in Q.24.48 is
Answer. -
3) Question.
The quantity of lean concrete (1:4:8) for the surface drain mentioned in Q.24.48 is
Answer. -
4) Question.
The cost of of the earthwork in excavation for the surface drain of cross-section shown in below Fig. for a total length of 5 metres @ Rs.450% cum, is
Answer. -
5) Question.
Cost of fittings and their fixing is specified for the following sanitary fittings
Answer. -
6) Question.
in case of laying gullies,siphons,intercepting traps,the cost includes
Answer. -
7) Question.
Size,capacity and materials need be specified for
Answer. -
8) Question.
Pick up the correct statement in case of water supply.
Answer. -
9) Question.
Pick up the correct statement from the following:
Answer. -
10) Question.
The expected out turn for earth work excavation in ordinary soil per mazdoor per day is
Answer.