Estimate and Costing Sheet 10
-
1) Question.
Pick up the correct statement from the following:
Answer. -
2) Question.
The item of steel work which is messured in sq. m, is
Answer. -
3) Question.
Pick up the item whose weight is added to the weight of respective item, is
Answer. -
4) Question.
The item of the brick structure measured in sq. m, is
Answer.IS 1200 PART-3
16. BRICK EDGINGS
16.1 Brick edgings, as to roads and the like, shall be described and measured in running metres.
18. BROKEN GLASS COPING
l8.1 Broken glass coping laid along with brickwork shall be measured in square metres and described stating thickness of mortar and weight of broken glass per square metre of coping.
19. DAMP-PROOF COURSES
19.1 Damp-proof course shall be described and measured in square metres stating thickness. Description shall include levelling up and/or
preparing brickwork to receive the treatment and use and waste of form work, if required.
19.1.1 Vertical and horizontal damp-proof courses shall be measured separately.Brickwork in Arches - cu m
Reinforced Brickwork - cu m
Honey comb brickwork- sq m
Brick flat soling- sq m
half brickwork- sq m
-
5) Question.
Brick walls are measured in sq. m if the thickness of the wall is