Environmental Engineering Sheet 3
-
1) Question.
The detention period and overflow rate respectively for plan sedimentation with coagulation are generally
Answer. -
2) Question.
For a given discharge, the efficiency of sedimentation tank can be increased by
Answer. -
3) Question.
The settling velocity of a particle in a sedimentation tank increases if
Answer. -
4) Question.
The settling velocity of a particle ina sedimentation tank depends on
Answer. -
5) Question.
Percentage of bacterial load that can be removed from water by the process of plan sedimentation is about
Answer. -
6) Question.
The overflow rate for plan sedimentaion tanks is about
Answer. -
7) Question.
The length of rectangular sedimentation than should not be more than
where B is the width of the tank
Answer. -
8) Question.
The velocity of flow of water in a sedimentation tank is about
Answer. -
9) Question.
The dissolved oxygen level in natural unpolluted waters at normal temperature is found to be of the order of
Answer. -
10) Question.
The amount of residual chlorine left in public water supply for safety against pathogenic bacteria is about
Answer. -
11) Question.
The yield of a surface stream may be obtained by -
Answer. -
12) Question.
The growth of population may be conveniently represented by -
Answer. -
13) Question.
The formula, F= R-K(1.8 T+32), for obtaining the annual run-off is known as -
Answer. -
14) Question.
According to Vermule's formula, the annual run-off(F) in cm is given by -
[Where, R= Annual rainfall in cm, T= Mean annual temperature in °C, and K= A constant]
Answer. -
15) Question.
Run-off is the water which flows -
Answer. -
16) Question.
The water of a river has an important property called -
Answer. -
17) Question.
The open wells or dug wells -
Answer. -
18) Question.
The most important source of water for public water supply is -
Answer. -
19) Question.
The open wells or dug wells are also known as -
Answer. -
20) Question.
The portion of soil through which lateral movement of water takes place is called -
Answer.