In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the con-sequent rebound is measured. For a safe pile, the net settlement(i.e. total settlement minus rebound) per tonne of test load should not exceed


Display Comments


Leave a comment

Login at first then you can submit comment. Click here to login.