A fill having a volume of 1,50,000 cum is to be constructed at a void ratio of 0.8. The borrow pit soil has a void ratio of 1.4. The volume of soil required (in cubic metres) to be excavated from the borrow pit will be
Display Comments
Leave a comment
Login at first then you can submit comment. Click here to login.